久久伊人精品青青草原2021&精品欧美一区成人&99在线热播&国产在线欧美日韩精品一区&精品亚洲aⅴ在线无码播放&德国妓女精品性hd&欧美肥婆精品一区二区

 

Beijing Benz Phase III Secondary Distribution Project

Construction time: November 15, 2017 - November 14, 2018

Building area: 90,000㎡

Product features: M282 engine with small displacement

Scope of contracting: plant equipment secondary distribution, process lighting

Contracting mode: Electromechanical professional contracting

 
Category:

Project highlights:

1.Winning the honorary certificates of "Outstanding Contribution Award for Safety Environment" and "Advanced Quality Management Unit";

2.The first plant of Benz that adopts the intelligent lighting system in the form of IoT;

3.The first plant that adopts the LDS spray coating technology to produce engine blocks, making the engine lighter and more durable, being the first engine model and plant of Benz to be exported abroad;


 Aerial view   Pictures of the front door of the project

 

 

Project awards

Outstanding Contribution Award for Safety and Environmental Management

Advanced Quality Management Unit

  • toolbar
    Back to Top